[Web] Cost Basis in Portfolio view different from Cost Basis in Performance view
acknowledged
T
Tangerine Tyrannosaurus
The Cost Basis under the Portfolio View on the right-hand side of the page looks to be correct whereas the yellow Cost Basis underneath Performance → Unrealized Return appears to be wildly off. Including Screenshots of each as well as Total Return (that includes Net Deposits) for reference.
Photo Viewer
View photos in a modal
Log In
Sarah R - CoinTracker
updated the status to
acknowledged